000 | 01083nam a2200217Ia 4500 | ||
---|---|---|---|
003 | NULRC | ||
005 | 20250520100547.0 | ||
008 | 250520s9999 xx 000 0 und d | ||
020 | _a471009601 | ||
040 | _cNULRC | ||
050 | _aHD 9715.A2 .A38 1976 | ||
100 |
_aH. N. Ahuja _eauthor |
||
245 | 0 |
_aConstruction performance control by networks / _cH. N. Ahuja |
|
260 |
_aNew York : _bWiley, _cc1976 |
||
300 |
_axvii, 636 pages : _billustrations ; _c24 cm. |
||
504 | _aIncludes index. | ||
505 | _aPart I. Problem Definition -- Part II. Alternatives -- Part III. Feasibility -- Part IV. Optimization -- Part V. Implementation -- Part VI. A Case Study. | ||
520 | _aThe Critical Path Method (CPM), which has been used by project planners to plan construction projects, is considered as a tool in system design. Having recognized other needs, such as minimizing costs, maximizing profits, or minimizing project duration, some planners have developed specific procedures based on network planning methods. | ||
650 | _aCONSTRUCTION INDUSTRY -- MANAGEMENT | ||
942 |
_2lcc _cBK |
||
999 |
_c7935 _d7935 |