000 01083nam a2200217Ia 4500
003 NULRC
005 20250520100547.0
008 250520s9999 xx 000 0 und d
020 _a471009601
040 _cNULRC
050 _aHD 9715.A2 .A38 1976
100 _aH. N. Ahuja
_eauthor
245 0 _aConstruction performance control by networks /
_cH. N. Ahuja
260 _aNew York :
_bWiley,
_cc1976
300 _axvii, 636 pages :
_billustrations ;
_c24 cm.
504 _aIncludes index.
505 _aPart I. Problem Definition -- Part II. Alternatives -- Part III. Feasibility -- Part IV. Optimization -- Part V. Implementation -- Part VI. A Case Study.
520 _aThe Critical Path Method (CPM), which has been used by project planners to plan construction projects, is considered as a tool in system design. Having recognized other needs, such as minimizing costs, maximizing profits, or minimizing project duration, some planners have developed specific procedures based on network planning methods.
650 _aCONSTRUCTION INDUSTRY -- MANAGEMENT
942 _2lcc
_cBK
999 _c7935
_d7935