000 01612nam a2200217Ia 4500
003 NULRC
005 20250520102946.0
008 250520s9999 xx 000 0 und d
020 _a70278156
040 _cNULRC
050 _aTH 437 .H44 1975
100 _aHeery, George T.
_eauthor
245 0 _aTime, cost, and architecture /
_cGeorge T. Heery
260 _aNew York :
_bMcGraw Hill Education,
_cc1975
300 _aviii, 212 pages :
_billustrations ;
_c25 cm.
504 _aIncludes index.
505 _aPreface -- 1. New directions in design with construction management: fourteen case histories -- 2. A management approach to the construction program -- 3. The owner -- 4. Introduction to the time/cost control system -- 5. Predesign project analysis -- 6. Systems approach to design -- 7. A cost-control system -- 8. Time control, contract time provisions, and contract time-extension rulings -- 9. Productive use of the critical path method and other computer-assisted scheduling techniques -- 10. Phased, separate, and transferable contracts -- 11. Bid and negotiations management -- 12. Construction management in the construction phase -- Index.
520 _aThis book describes a definitive system for time and cost control that may be applied within any given program of requirements, quality level, or design goal. The system has been used effectively on many projects of varying size and type, for private and governmental owners, and in various areas of the United States and abroad, including some of the most difficult of construction markets.
650 _aBUILDING
942 _2lcc
_cBK
999 _c19845
_d19845