Construction performance control by networks / H. N. Ahuja
Material type:
- 471009601
- HD 9715.A2 .A38 1976

Item type | Current library | Home library | Collection | Call number | Copy number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|---|---|
![]() |
National University - Manila | LRC - Annex Relegation Room | Gen. Ed. - COE | GC HD 9715.A2 .A38 1976 (Browse shelf(Opens below)) | c.1 | Available | NULIB000005694 |
Browsing LRC - Annex shelves, Shelving location: Relegation Room, Collection: Gen. Ed. - COE Close shelf browser (Hides shelf browser)
No cover image available |
![]() |
No cover image available | No cover image available | No cover image available | No cover image available |
![]() |
||
GC HD 6971 .I53 1986 Industrial relations in a new age / | GC HD 7269 .E94 1985 Behind the poison cloud : Union Carbide's Bhopal massacre / | GC HD 8039.B92 .R54 1979 Hard hats : the work world of construction workers / | GC HD 9715.A2 .A38 1976 Construction performance control by networks / | GC HD 9715.A2 .G65 1977 Construction management : principles and practices / | GC HD 9715.A2 .L83 1986 International construction business management : a guide for architects, engineers, and contractors / | GC HD 9715.A2 .O37 1971 CPM in construction management : project management with CPM / |
Includes index.
Part I. Problem Definition -- Part II. Alternatives -- Part III. Feasibility -- Part IV. Optimization -- Part V. Implementation -- Part VI. A Case Study.
The Critical Path Method (CPM), which has been used by project planners to plan construction projects, is considered as a tool in system design. Having recognized other needs, such as minimizing costs, maximizing profits, or minimizing project duration, some planners have developed specific procedures based on network planning methods.
There are no comments on this title.