Construction management of industrial projects : a modular guide for project managers / Mohamed A. El-Reedy
Material type:
- 9780470878163
- TH 438 .E47 2011

Item type | Current library | Home library | Collection | Call number | Copy number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|---|---|
![]() |
National University - Manila | LRC - Main General Circulation | Civil Engineering | GC TH 438 .E47 2011 (Browse shelf(Opens below)) | c.1 | Available | NULIB000011162 |
Browsing LRC - Main shelves, Shelving location: General Circulation, Collection: Civil Engineering Close shelf browser (Hides shelf browser)
![]() |
No cover image available |
![]() |
![]() |
![]() |
![]() |
![]() |
||
GC TH 437 .H37 2015 BIM and construction management : proven tools, methods, and workflows / | GC TH 438 .B37 1992 Professional construction management including CM, design-construct, and general contracting / | GC TH 438 .C66 2015 Construction project management : a practical guide to field construction management / | GC TH 438 .E47 2011 Construction management of industrial projects : a modular guide for project managers / | GC TH 438 .G68 2014 Construction project management / | GC TH 438 .O95 1996 Management techniques applied to the construction industry / | GC TH 443 .G64 2013 Construction safety and health / |
Includes bibliographical references and index.
Preface. 1. Introduction. 2. Project Management. 2.1 The Principle of Project Management. 2.2 Project Characteristics. 2.3 Project Life Cycle. 2.4 Is this Project Successful? 2.5 Project Management Tasks. 2.6 Project Manager Skill. 3. Economic Risk Analysis. 3.1 Introduction. 3.2 Project Cash Row. 3.3 Economic Risk Assessment. 3.4 Decision Tree. 3.5 Monte-Carlo Simulation Technique. 3.6 Risk Adjusted Value (RAV). 4. Time Planning. 4.1 Introduction. 4.2 Responsibilities of the Team. 4.3 Expected Activity Time Period. 4.4 Calculating the Activity Time Period. 4.5 Time Schedule Preparation. 4.6 Planning Overview. 5. Resource Management. 5.1 Introduction. 5.2 Project Organization. 5.3 Roles and Responsibilities of the Project Manager. 5.4 Administrative Organization for Total Quality Management. 5.5 Team Member Selection. 5.6 Managing the Team. 5.7 Allocate Resources to Project Plan. 5.8 Relation Between Project Parties. 5.9 Document and Information Transfer. 5.10 Information Transfer. 5.11 Quality Control in the Design Phase. 6. Cost Management. 6.1 Introduction. 6.2 Cost Types. 6.3 Economic Analysis of Project Cost. 6.4 Cash Flow Calculation. 7. Bidding, Tenders, and Contracts. 7.1 Introduction. 7.2 Contracts. 7.3 Contracts Between an Owner and an Engineering Consultancy Office. 7.4 The Importance of Contracts for Project Quality Assurance (QA). 7.5 Contracts in ISO. 7.6 FIDIC Contracts. 7.7 General Conditions in Contracts. 7.8 Arbitration and the Arbitrator. 7.9 Bids and Tenders. 7.10 Closeout Report. 8. Quality From Theory to Reality. 8.1 Introduction. 8.2 Quality Management Systems. 8.3 The ISO 9000 Standard. 8.4 Quality Management Requirements. 8.5 Project Quality Control in Various Stages. 8.5.1 Feasibility Study Stage 239 8.5 Operational Phase of the Project. 8.7 The "Total Building Commissioning System". 9. Project Risk Management. 9.1 Introduction. 9.2 Project Risks. 9.3 Risk Assessment. 9.4 Risk Identification. 9.5 Defining Priorities. 9.6 Risk Response Planning and Strategies. 9.7 Risk Monitoring and Control. 9.8 Example. 9.9 Methods of Risk Avoidance. 10. Quiz for Project Management. 10.1 Introduction. 10.2 Questions. 10.3 The Right Decisions. References. Index. About the Author.
This book presents techniques for effective and successful project management across all phases of the project, covering all of the management tools and leadership skills for any industrial project.
There are no comments on this title.