Construction estimates : (Record no. 17644)

MARC details
000 -LEADER
fixed length control field 04139nam a2200217Ia 4500
003 - CONTROL NUMBER IDENTIFIER
control field NULRC
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250520102857.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250520s9999 xx 000 0 und d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 70216517
040 ## - CATALOGING SOURCE
Transcribing agency NULRC
050 ## - LIBRARY OF CONGRESS CALL NUMBER
Classification number TH 435 .C66 1995
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Foster, Norman.
Relator term author
245 #0 - TITLE STATEMENT
Title Construction estimates :
Remainder of title from take-off to bid /
Statement of responsibility, etc. Martin Brook
250 ## - EDITION STATEMENT
Edition statement Third edition.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. New York :
Name of publisher, distributor, etc. McGraw Hill Education,
Date of publication, distribution, etc. c1995
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 240 pages :
Other physical details illustrations ;
Dimensions 24 cm.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Estimating and Tendering for Construction Work -- Copyright Page -- Abbreviations used in the text -- 1. Organization of the estimating function -- Team roles and organization -- Quality management -- Health, safety and welfare -- 2. Procurement paths -- Introduction -- Clients' needs -- Contractor involvement -- Part nering. -- Apportionment of risk -- Traditional method -- Design and build -- Management contracting -- Construction management -- Private Finance Initiative -- 3. Forms of contract -- Introduction -- Essentials of a valid construction contract. Standard forms of contractSub-contract forms -- Understanding contractual obligations -- 4. Tender documentation -- Introduction -- Coordinated project information -- Documents used as the basis of a tender -- Formal tender documents -- 5. Estimating methods -- Introduction -- Single-rate approximate estimating -- Multiple-rate approximate estimating -- Approximate quantities -- Analytical estimating -- Operational estimating -- 6. Contractor selection and decision to tender -- Introduction -- Bundling projects -- Competition and negotiation -- Abuse of tendering procedures -- Decision to tender -- Inspection of tender documents. Competition legislation -- 7. Project appreciation and enquiries to suppliers and sub-contractors -- Introduction -- Estimate timetable -- Pricing strategy -- Schedules -- The estimating team -- Visits to consultants and site -- Enquiries to suppliers and sub-contractors -- Enquiries for materials -- Enquiries to sub-contractors -- 8. Tenders with cost planning -- Introduction -- Terminology -- Cost plan aims -- Funding and affordability -- Benchmarking -- Cost benchmarking -- Re-basing cost data -- Target cost plans -- Design to cost -- Design to cost tools -- Controlling areas -- New build and refurbishment. Pricing the refurbishment of buildingsCondition surveys -- Furniture, equipment and ICT -- Fixtures, fittings and medical equipment in hospitals -- Aspects of good practice -- Adjustments for location -- Cost plan format -- 'Linear' bill of quantities -- Tender timetable and reviews -- Final review -- Value drawdown charts -- 9. Tender planning and method statements -- Introduction -- The role of the planning engineer -- Method statements -- Logistical planning -- Tender programmes -- 10. Resource costs -- labour, materials and plant -- Introduction -- Lab our. rates -- Material rates -- Plant rates -- 11. Unit rate pricing. IntroductionComponents of a rate -- Method of measurement -- Pricing notes -- Model rate and pricing examples -- 12. Sub-contractors and market testing -- Introduction -- Domestic sub-contractors -- Nominated sub-contractors -- Market testing rates for cost planned tenders -- 13. Risk, opportunities and fluctuations -- Introduction -- Risks and opportunities -- Risk management -- Collaborative projects -- Risk workshops -- Pricing risks -- Range of possible outcomes -- Comparison of common distributions -- Monte Carlo simulation -- Standard fluctuations clauses -- Calculation of non-recoverable increases. Inflation calculations for tenders with cost planning.
520 ## - SUMMARY, ETC.
Summary, etc. The third edition contains all of he take-off examples and general text of the first and second editions - plus expanded treatment of the general estimating procedures, pricing of general conditions and overhead, new take-off techniques for masonry, and most important the complete drawings, specification data, take-off and priced estimate of a
Linkage 60,000 building. The pricing has been updated to reflect current prices.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element BUILDING -- ESTIMATES
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Books
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Shelving location Date acquired Source of acquisition Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
    Library of Congress Classification     Architecture LRC - Architecture National University - Manila General Circulation 05/09/2018 Reaccessioned   GC TH 435 .C66 1995 NULIB000015403 05/20/2025 c.1 05/20/2025 Books