Construction estimates : (Record no. 17644)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 04139nam a2200217Ia 4500 |
003 - CONTROL NUMBER IDENTIFIER | |
control field | NULRC |
005 - DATE AND TIME OF LATEST TRANSACTION | |
control field | 20250520102857.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 250520s9999 xx 000 0 und d |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
International Standard Book Number | 70216517 |
040 ## - CATALOGING SOURCE | |
Transcribing agency | NULRC |
050 ## - LIBRARY OF CONGRESS CALL NUMBER | |
Classification number | TH 435 .C66 1995 |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Foster, Norman. |
Relator term | author |
245 #0 - TITLE STATEMENT | |
Title | Construction estimates : |
Remainder of title | from take-off to bid / |
Statement of responsibility, etc. | Martin Brook |
250 ## - EDITION STATEMENT | |
Edition statement | Third edition. |
260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
Place of publication, distribution, etc. | New York : |
Name of publisher, distributor, etc. | McGraw Hill Education, |
Date of publication, distribution, etc. | c1995 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xiv, 240 pages : |
Other physical details | illustrations ; |
Dimensions | 24 cm. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Estimating and Tendering for Construction Work -- Copyright Page -- Abbreviations used in the text -- 1. Organization of the estimating function -- Team roles and organization -- Quality management -- Health, safety and welfare -- 2. Procurement paths -- Introduction -- Clients' needs -- Contractor involvement -- Part nering. -- Apportionment of risk -- Traditional method -- Design and build -- Management contracting -- Construction management -- Private Finance Initiative -- 3. Forms of contract -- Introduction -- Essentials of a valid construction contract. Standard forms of contractSub-contract forms -- Understanding contractual obligations -- 4. Tender documentation -- Introduction -- Coordinated project information -- Documents used as the basis of a tender -- Formal tender documents -- 5. Estimating methods -- Introduction -- Single-rate approximate estimating -- Multiple-rate approximate estimating -- Approximate quantities -- Analytical estimating -- Operational estimating -- 6. Contractor selection and decision to tender -- Introduction -- Bundling projects -- Competition and negotiation -- Abuse of tendering procedures -- Decision to tender -- Inspection of tender documents. Competition legislation -- 7. Project appreciation and enquiries to suppliers and sub-contractors -- Introduction -- Estimate timetable -- Pricing strategy -- Schedules -- The estimating team -- Visits to consultants and site -- Enquiries to suppliers and sub-contractors -- Enquiries for materials -- Enquiries to sub-contractors -- 8. Tenders with cost planning -- Introduction -- Terminology -- Cost plan aims -- Funding and affordability -- Benchmarking -- Cost benchmarking -- Re-basing cost data -- Target cost plans -- Design to cost -- Design to cost tools -- Controlling areas -- New build and refurbishment. Pricing the refurbishment of buildingsCondition surveys -- Furniture, equipment and ICT -- Fixtures, fittings and medical equipment in hospitals -- Aspects of good practice -- Adjustments for location -- Cost plan format -- 'Linear' bill of quantities -- Tender timetable and reviews -- Final review -- Value drawdown charts -- 9. Tender planning and method statements -- Introduction -- The role of the planning engineer -- Method statements -- Logistical planning -- Tender programmes -- 10. Resource costs -- labour, materials and plant -- Introduction -- Lab our. rates -- Material rates -- Plant rates -- 11. Unit rate pricing. IntroductionComponents of a rate -- Method of measurement -- Pricing notes -- Model rate and pricing examples -- 12. Sub-contractors and market testing -- Introduction -- Domestic sub-contractors -- Nominated sub-contractors -- Market testing rates for cost planned tenders -- 13. Risk, opportunities and fluctuations -- Introduction -- Risks and opportunities -- Risk management -- Collaborative projects -- Risk workshops -- Pricing risks -- Range of possible outcomes -- Comparison of common distributions -- Monte Carlo simulation -- Standard fluctuations clauses -- Calculation of non-recoverable increases. Inflation calculations for tenders with cost planning. |
520 ## - SUMMARY, ETC. | |
Summary, etc. | The third edition contains all of he take-off examples and general text of the first and second editions - plus expanded treatment of the general estimating procedures, pricing of general conditions and overhead, new take-off techniques for masonry, and most important the complete drawings, specification data, take-off and priced estimate of a |
Linkage | 60,000 building. The pricing has been updated to reflect current prices. |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | BUILDING -- ESTIMATES |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Source of classification or shelving scheme | Library of Congress Classification |
Koha item type | Books |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection | Home library | Current library | Shelving location | Date acquired | Source of acquisition | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Library of Congress Classification | Architecture | LRC - Architecture | National University - Manila | General Circulation | 05/09/2018 | Reaccessioned | GC TH 435 .C66 1995 | NULIB000015403 | 05/20/2025 | c.1 | 05/20/2025 | Books |