Project scope management : (Record no. 15722)

MARC details
000 -LEADER
fixed length control field 02180nam a2200229Ia 4500
003 - CONTROL NUMBER IDENTIFIER
control field NULRC
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250520102813.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250520s9999 xx 000 0 und d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781482259483
040 ## - CATALOGING SOURCE
Transcribing agency NULRC
050 ## - LIBRARY OF CONGRESS CALL NUMBER
Classification number HD 69 .M68 2015
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Moustafaev, Jamal
Relator term author
245 #0 - TITLE STATEMENT
Title Project scope management :
Remainder of title a practical guide to requirements for engineering, product, construction, IT and enterprise projects /
Statement of responsibility, etc. Jamal Moustafaev
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Boca Raton, Florida :
Name of publisher, distributor, etc. CRC Press,
Date of publication, distribution, etc. c2015
300 ## - PHYSICAL DESCRIPTION
Extent xxviii, 338 pages :
Other physical details illustrations ;
Dimensions 24 cm.
365 ## - TRADE PRICE
Price amount USD39.93
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references and index.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Chapter 1. Introduction to scope management : who? -- Chapter 2. History of scope management -- Chapter 3. Writing project charters -- Chapter 4. Requirements, customers, users -- Chapter 5. High-level scope elicitation -- Chapter 6. Detailed requirements elicitation -- Chapter 7. Documenting requirements : information technology and software development projects -- Chapter 8. Documenting requirements: engineering and product development projects -- Chapter 9. Documenting requirements: Multidisciplinary projects -- Chapter 10. Creating the requirements management plan and requirements traceability matrix -- Chapter 11. Final product design -- Chapter 12. Creating work breakdown structures and WBS dictionaries -- Chapter 13. Troubleshooting scope problems -- Chapter 14. Scope verification -- Chapter 15. Controlling project scope.
520 ## - SUMMARY, ETC.
Summary, etc. Incomplete or missed requirements, omissions, ambiguous product features, lack of user involvement, unrealistic customer expectations, and the proverbial scope creep can result in cost overruns, missed deadlines, poor product quality, and can very well ruin a project. Project Scope Management: A Practical Guide to Requirements for Engineering, Product, Construction, IT and Enterprise Projects describes how to elicit, document, and manage requirements to control project scope creep. It also explains how to manage project stakeholders to minimize the risk of an ever-growing list of user requirements.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element PLANNING
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Books
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Shelving location Date acquired Source of acquisition Cost, normal purchase price Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
    Library of Congress Classification     Gen. Ed - CEAS LRC - Graduate Studies National University - Manila General Circulation 05/08/2017 Purchased - Amazon 79.86   GC HD 69 .M68 2015 NULIB000013481 05/20/2025 c.1 05/20/2025 Books